| Octet Number |
Description |
Note |
Status |
| None |
78-89 Specification of the outermost (or only) time range over which statistical processing is done |
None |
Operational |
| None |
90-nn These octets are included only if n > 1, where nn = 77 + 12 x n |
None |
Operational |
| 10 |
Parameter category |
Code/Flag Table 4.1 |
Operational |
| 11 |
Parameter number |
Code/Flag Table 4.2 |
Operational |
| 12-13 |
Aerosol type |
Code/Flag Table 4.233 |
Operational |
| 14 |
Type of interval for first and second sizes |
Code/Flag Table 4.91 |
Operational |
| 15 |
Scale factor of first size |
None |
Operational |
| 16-19 |
Scaled value of first size in metres |
None |
Operational |
| 20 |
Scale factor of second size |
None |
Operational |
| 21-24 |
Scaled value of second size in metres |
None |
Operational |
| 25 |
Type of generating process |
Code/Flag Table 4.3 |
Operational |
| 26 |
Background generating process identifier (defined by originating centre) |
None |
Operational |
| 27 |
Forecast generating process identifier (defined by originating centre) |
None |
Operational |
| 28-29 |
Hours after reference time of data cut-off |
(see Note 1) |
Operational |
| 30 |
Minutes after reference time of data cut-off |
None |
Operational |
| 31 |
Indicator of unit of time range |
Code/Flag Table 4.4 |
Operational |
| 32-35 |
Forecast time in units defined by octet 32 |
(see Note 2) |
Operational |
| 36 |
Type of first fixed surface |
Code/Flag Table 4.5 |
Operational |
| 37 |
Scale factor of first fixed surface |
None |
Operational |
| 38-41 |
Scaled value of first fixed surface |
None |
Operational |
| 42 |
Type of second fixed surface |
Code/Flag Table 4.5 |
Operational |
| 43 |
Scale factor of second fixed surface |
None |
Operational |
| 44-47 |
Scaled value of second fixed surface |
None |
Operational |
| 48 |
Type of ensemble forecast |
Code/Flag Table 4.6 |
Operational |
| 49-52 |
Number of forecasts in ensemble |
None |
Operational |
| 53 |
Forecast probability number |
None |
Operational |
| 54 |
Total number of forecast probabilities |
None |
Operational |
| 55 |
Probability type |
Code/Flag Table 4.9 |
Operational |
| 56 |
Scale factor of lower limit |
None |
Operational |
| 57-60 |
Scaled value of lower limit |
None |
Operational |
| 61 |
Scale factor of upper limit |
None |
Operational |
| 62-65 |
Scaled value of upper limit |
None |
Operational |
| 66-67 |
Year of end of overall time interval |
None |
Operational |
| 68 |
Month of end of overall time interval |
None |
Operational |
| 69 |
Day of end of overall time interval |
None |
Operational |
| 70 |
Hour of end of overall time interval |
None |
Operational |
| 71 |
Minute of end of overall time interval |
None |
Operational |
| 72 |
Second of end of overall time interval |
None |
Operational |
| 73 |
n - number of time range specifications describing the time intervals used to calculate the statistically processed field |
None |
Operational |
| 74-77 |
Total number of data values missing in statistical process |
None |
Operational |
| 78 |
Statistical process used to calculate the processed field from the field at each time increment during the time range |
Code/Flag Table 4.10 |
Operational |
| 79 |
Type of time increment between successive fields used in the statistical processing |
Code/Flag Table 4.11 |
Operational |
| 80 |
Indicator of unit of time for time range over which statistical processing is done |
Code/Flag Table 4.4 |
Operational |
| 81-84 |
Length of the time range over which statistical processing is done in units defined by the previous octet |
None |
Operational |
| 85 |
Indicator of unit of time for the increment between the successive fields used |
Code/Flag Table 4.4 |
Operational |
| 86-89 |
Time increment between successive fields in units defined by the previous octet |
(see Notes 3 and 4) |
Operational |
| 90-101 |
As octets 78 to 89, next innermost step of processing |
None |
Operational |
| 102-nn |
Additional time range specifications included in accordance with the value of n. Contents as octets 78 to 89, repeated as necessary |
None |
Operational |